HEALTHCARE QUALITY PAGE

Published February 2025
Is there a practical way to plan change interventions? — Part 3 on improving the change process
When actions are implemented without a clear understanding of what they involve and how they will work, they can produce superficial, short-lived change. People may make mistaken assumptions about how change will happen and how it will improve quality or patient safety.
A systematic approach to planning and implementing change includes these steps:
-
Identify the specific improvement to be achieved.
-
Mould opinion to favour the improvement among key stakeholders.
-
Prepare for a new way by selecting change interventions that are both effective and feasible.
-
Redesign or design the work, streamlining it where possible.
-
Operate the new way on a trial basis.
-
Verify that the new way works by measuring the effectiveness of change interventions.
-
Eliminate unwanted variation.
-
Stabilize the new way through ongoing monitoring and feedback.
One useful tool is to brainstorm possible change interventions, then rate each on a 1-to-7 scale for likely effectiveness in achieving the desired outcome and feasibility in the work environment. Measurement of effectiveness of change is essential: a new approach may satisfy those who thought up the change but does not result in improvement in the absence of evidence of the benefit.

